Directional drilling · Underground utilities Serving the Tampa Bay area Mon–Fri 8am–4pm · Closed weekends Call (813) 809-9624
Ace Utilities, directional drilling

Home / Services / Fiber pulling

Fiber pulling

Getting fiber through the duct without damaging it, whether it is pulled or blown in. We check the duct first, so the cable goes all the way through.

Fiber · pull or blow Duct proofing

Pull or blow

Some runs suit a pulling line; others suit blowing the fiber in with compressed air. We do both, and we choose by the duct and the cable rather than by habit.

Proofing comes first

Before any fiber goes in, we proof the duct with air-driven mandrels or pushing rodders. That finds crushed or blocked sections while they are still cheap to fix, instead of halfway through a pull.

What we handle

  • Fiber pulled through new or existing duct
  • Fiber blown in where the run suits it
  • Existing duct runs proofed before install
  • New duct placed by our own drilling and trenching crews

Free estimates on every job

Send us the footage and the location. Or call (813) 809-9624.

Request a bid